Stagg High School in Stockton Unified School District completes the construction of a first-ever athletic stadium, complete with modern facilities and a durable Enviroplex concession/restroom facility.

Project Overview

Good for the students, good for the community.

The passage of Measure Q made possible the construction of the first-ever athletic stadium at Stockton Unified School District’s Stagg High School. Along with impressive new track and fields, lighting and grandstand seating, the scope included a modern, easy-to-maintain Enviroplex-built concession/restroom facility with features and fixtures that would stand the test of time. A separate Enviroplex-built 10’ x 10’ ticket booth harmonized the new facilities.

Completed in August 2010, the 960-square-foot concession/restroom building’s custom-designed floor plan met all of the athletic program’s requirements: multiuser boys’ and girls’ restrooms on one side of the building and the concession area and storage/maintenance room on the other side, stainless steel roll-up windows to service the efficiently spaced concession sales area and 5-foot front and rear overhangs for added protection from inclement weather. A site-applied three-coat stucco exterior custom-painted with Stagg High’s school logo gives the building a striking, polished look.

Client

Stockton Unified School District

Location

Stockton, California

Project Scope and Size

960 sq. ft concession/restroom buildings.

Key Building Features

  •  Integrated 1.5:12 pitch roof
  • Kynar colored roofing
  • Front, rear and side overhangs
  • Three-coat stucco exterior
  • Concrete stem-wall foundation
  • Custom stainless steel roll-up windows
  • Custom stainless steel counter tops
  • Full-floor and full-height ceramic tile
  • Solid plastic toilet partitions

From Our Clients

“It is so great to see all of our children back at school. I really did miss them over the summer! And it is an extra special treat that our children are now in classrooms that are much more conducive for learning. The favorite comment from the children is, ‘the bathrooms are so clean and there’s green handles for the flushers.’ You have to love children’s expressions; I smile all day long.”

Kathleen Brewster

Albert Schweitzer Elem. School

“The Evergreen School District has used Enviroplex buildings for over ten years. We have purchased over 150 classrooms, bathrooms, and library buildings in various configurations. The newer configurations with pitched metal roofs, stucco-like finish, thicker installation, and internal HVAC units have been well received by our teachers and community. We also appreciate Enviroplex’s commitment to deliver the buildings on time for our accelerated eight-week summer construction schedule. During the last two years we have purchased 39 units, and they were all received during the one week window we gave Enviroplex.”

James Crawford

Evergreen School District

“Our students and teachers are truly enjoying and appreciating your classrooms. Enviroplex delivered this project as promised, on time, per specification and with minimal change orders. I realize how difficult this can be on a multi-million dollar project. We are entirely satisfied with the feel and sound quality of your concrete paneled floor system. I have heard zero complaints from our “1st Floor Teachers”. Thank you again for a very favorable construction experience.”

Roy Miller

Emery Unified School District

“We are thrilled with the result of our beautiful renovation. We now have 5 new classrooms to replace our ‘1962’ portables and trailer. It has been exhilarating to watch the weekly progress this summer. Our landscaping, classroom and parking lot makeover has greatly improved our community school.”

Kathleen Brewster

Albert Schweitzer Elem. School